Building

LIRA-FEM 2026 R1 Last updated: Jun 05, 2026 17:17:34
  • Implemented support for a composite BIM model based on several linked tasks. The “Load building” command allows connecting individual buildings from other projects into the master project not as a copy of geometry, but as dynamically linked objects.

    When the source file changes, the connected building can be updated with the “Update building” command without re-import. Along with geometry, materials, loads, assignments, and other configured building parameters are transferred.

    Calculation is performed on a single composite model, allowing the object to be considered as a unified spatial system taking into account the mutual influence of all connected parts.

Loading buildings into master project

Loading buildings into master project
  • Implemented the “Compare building” function, designed for analyzing model versions and identifying changes between project variants.

    The dialog allows displaying:

    • added objects — in green;
    • deleted — in red;
    • modified — in blue.

    For convenient work, filtering by structural objects, grouping, and sorting of changes by type, floors, and object types is provided.

Building comparison

Building comparison
  • Added a function to create a new building based on selected project objects. The chosen elements are transferred from the current building to the newly created one while preserving the floor structure of the original model.
  • Improved project structure handling: in the new version, the user-defined state of the tree expansion is preserved.